Artist's impression of Trinity Rainfora at dusk, two towers with planted sky terraces above a lit podium in Bandar Kinrara
Trinity Group · ten projects delivered, all on time or earlyArtist's impression, developer material

Trinity Rainfora, Bandar Kinrara

Freehold, and 400 metres of covered walkway to the LRT.

535 homes in two 31-storey towers. Topped out May 2026. Block A sold out, Block B now open.

RM568,000 From · about RM2,172 a month

Free · No obligation · Replies in 5 min

535Homes, two towers
400 mCovered walk to LRT
FreeholdServiced apartment
36Facilities

Overview

A rainforest brief, on a transit site

Trinity Rainfora sits on 2.4 acres of freehold land in Bandar Kinrara, Puchong, and is built around one practical idea: a 400 metre covered walkway to the Kinrara BK5 LRT station. Covered is the part that matters. A walk you will actually take in a downpour is worth more than a shorter one you will not.

Two 31-storey towers hold 535 homes from 739 to 1,184 sq ft. The developer marked the topping out in May 2026, which means the structure is up and the remaining risk is fit-out rather than construction. Block A, launched September 2024, is fully taken up. Block B is the phase now on sale.

Artist's impression of the Trinity Rainfora grand lobby and lift lobby, with timber slat walls and a double volume seating lounge
Grand lobby and lift lobby, artist's impression

Floor plans

Six layouts, 739 to 1,184 sq ft

Every layout has a balcony and a kitchen cabinet included. Type E is the dual key, which gives you a separate studio with its own entrance behind the same front door. Drawings below are the developer's own.

Trinity Rainfora Type B floor plan, 739 square feet, two bedrooms, two bathrooms, one balcony

Type B / B1

739 sq ft, 2 bedrooms, 2 bathrooms, 1 balcony

Overall width
6,700 mm
Kitchen cabinet
Included
Air conditioning
Pre-installed, Panasonic
Check 2BR availability

The developer has not published a per-unit price list, so the figures on this page are the published entry price for Block B rather than a price for each type. Ask us for the current unit list. Instalments assume a 90 percent margin of finance over 35 years at 3.7 percent per annum, and are indicative for budgeting rather than an offer of finance.

Facilities

36 facilities, and a waterfall you can sit under

The podium deck carries the set the project is named for. The ones below are the facilities the developer has named publicly; the full 36 are listed on the podium plan in the brochure.

Artist's impression of the Rainforest Canopy at Trinity Rainfora, a curved white canopy with a waterfall falling into a lit infinity pool at dusk
Rainforest Canopy and Waterfall Jacuzzi, artist's impression

Water and wellness

  • 25 m infinity pool
  • Rainforest Canopy
  • Waterfall Jacuzzi
  • Aqua gym
  • Yoga deck
  • Gymnasium

Green and social

  • 150 m jogging trail, 1.5 to 2.7 m wide
  • Glamping Forest
  • Study Garden
  • Nature Playscape
  • Edible garden
  • Co-working spaces
  • Multipurpose hall, 864 sq ft, seats about 50
Artist's impression of the Moonlit Skyrun, a lit rooftop running loop through planted terraces at Trinity Rainfora
Moonlit Skyrun, rooftop, artist's impression

Location

Bandar Kinrara 5, Puchong

The site connects to Kinrara BK5 LRT station on the Sri Petaling line by a 400 metre covered walkway, with direct access to the Bukit Jalil Highway, the LDP and Kesas. Distances below are from the developer's own connectivity chart.

KPJ Ambulatory Care Centre Kinrara
400 m
Giant Hypermarket
1 km
SJK (C) Yak Chee
3 km
Tzu Chi International School
4 km
SK Puchong Jaya
5 km
Pavilion Bukit Jalil
6 km
SetiaWalk Mall
6 km
Sunway Medical Centre
6 km
Monash University Malaysia
7 km
IOI Mall Puchong
7 km
Sunway Pyramid
8 km
Aerial artist's impression showing Trinity Rainfora in Bandar Kinrara with the 400 metre distance to Kinrara BK5 LRT station marked
Aerial view with the LRT distance marked
Illustrated connectivity map showing Trinity Rainfora relative to Puchong, Bukit Jalil, Seri Kembangan and the surrounding expressways
Developer connectivity map, illustrative

Gold Assurance

The warranty is longer than the standard

Trinity backs the project with a 10-Year Gold Assurance Program. The industry standard defect liability period is 24 months, so the comparison below is the reason to care.

36Months defect liability
Standard is 24
10Years warranty
Against roof leaks
5Years warranty
Against tile pop-ups
Trinity Gold Assurance graphic showing the 36 month defect liability period, 10 year roof leak warranty and 5 year tile pop-up warranty
Developer material

Developer

Trinity Group Sdn Bhd

Trinity Group has delivered developments with a cumulative gross development value above RM2.8 billion. Trinity Rainfora itself carries a GDV of RM395 million. The legal developer entity for this project is Darul Dinasti Sdn Bhd, with Jasmurni Construction as main contractor and Visage Architect as architect.

Side by side comparison from the developer, an artist's impression of an arched water feature next to a photograph of the same feature as built
The developer's own artist impression against the delivered product

The record that matters when you are buying something that is not finished is whether the developer hands over when they said they would. Trinity publishes the following delivery history for ten completed developments. Every one of them was delivered on schedule or ahead of it, and the most recent handover was September 2025.

Source: Trinity Group sales kit, October 2025
ProjectUnitsLaunchedCompletedAgainst schedule
Heron Residency, Bandar Bukit Puchong290Sep 2005Jan 20088 months ahead
19 Residency, Bandar Bukit Puchong24Mar 2008May 201010 months ahead
The Zest, Kinrara 9764Apr 2009Jan 20123 months ahead
The Z Residence, Bukit Jalil1,136Jun 2011Jun 2014On schedule
Latitude, USJ 1915Nov 2010Jan 201311 months ahead
Zeva, Equine South778Jun 2012Jun 2015On schedule
Trinity Aquata, Sungai Besi4922015Nov 2018On schedule
Trinity Lemanja, Kepong5832017Oct 2021On schedule
Trinity Pentamont, Mont Kiara3302018Mar 2023On schedule
Trinity Wellnessa, Ampang North4632022Sep 20254 months ahead

The Zest sits at Kinrara 9, a few minutes from this site, so it is the one you can go and look at. A delivery record is history and not a guarantee for this project, but it is the closest thing to evidence available before a building is handed over.

The building

Particulars

Towers2, of 31 storeys each
Homes535
Land area2.4 acres
TenureFreehold
TitleCommercial title, serviced apartment
Built-up range739 to 1,184 sq ft
Ceiling heightApproximately 2.8 m
Common corridorApproximately 6 ft wide
Visitor parking54 bays across levels 1, 3 and 4
EV charging5 bays on level 4
Air conditioningPanasonic, installed before handover
Backup powerGenerator, about 8 hours
StructureTopped out May 2026
CompletionAugust 2028, per the advertising permit

Worth knowing

Why buyers sign, and why some walk away

2.4Acres, freehold
31Storeys per tower
2.8 mCeiling height
RM395mProject GDV

Why buyers sign

  • Freehold land, which is not common on a transit-connected site at this price.
  • A 400 m covered walkway to the LRT, not an uncovered one.
  • The structure has topped out, so the remaining build risk is fit-out.
  • 36-month defect liability against an industry standard of 24, plus 10-year roof and 5-year tile warranties.
  • Air conditioning and kitchen cabinet already included, which is real money at handover.
  • Block A sold out ahead of schedule, which is a genuine demand signal for the address.

Why some walk away

  • Commercial title. It is freehold, but the title is commercial and the product is a serviced apartment, so assessment, utility tariffs and loan terms can differ from a residential-title condominium. Check with your bank before you commit.
  • Completion is 2028 on the permit, so progress billings run for years yet.
  • The developer has not published a per-unit price list, so the entry figure is a starting point rather than the price of the unit you want.
  • Block A is gone, so choice is now limited to what remains in Block B.
  • Bandar Kinrara is built out, so the surrounding roads carry real traffic at peak.

Next step

Ask for the live Block B list

Floor plans, the current price list and what is still available in Block B, sent straight to your WhatsApp.

Free · No obligation · Direct WhatsApp reply

Questions

Frequently asked

Where is Trinity Rainfora?
Bandar Kinrara 5, Puchong, Selangor, connected to Kinrara BK5 LRT station on the Sri Petaling line by a 400 metre covered walkway, with direct access to the Bukit Jalil Highway, the LDP and Kesas.
Is it freehold?
Yes, the land is freehold. The title is a commercial title and the product is a serviced apartment, which is a separate question from tenure and is worth raising with your bank, because assessment, utility tariffs and financing terms can differ from a residential-title condominium.
How much is it?
Block B, the phase now on sale, is published from RM568,000. The developer has not released a per-unit price list, so ask us for the current availability and the price of the specific layout you want.
Is Block A still available?
No. Block A, which launched in September 2024, was fully taken up ahead of schedule, and the developer opened Block B for purchase in May 2026.
What sizes and layouts are there?
Six layouts from 739 to 1,184 sq ft: Type B and B1 at 739 sq ft with two bedrooms, Type C at 974 and Type D at 1,026 with three bedrooms, Type E at 1,124 as a dual key with three plus one bedrooms, and Types F and G at 1,136 and 1,184 with four bedrooms.
When will it be completed?
The advertising permit records an expected completion of August 2028. The developer's own topping-out announcement in May 2026 targeted 3Q2027 for both towers, so the permit date is the more conservative of the two.
What is included in the unit?
Panasonic air conditioning installed before handover, with 2.0 HP to the living and dining area and 1.0 HP to each bedroom, a kitchen cabinet with hood and hob, a water heater, and plaster ceiling to the foyer, hallway and bathrooms.
What is the monthly instalment?
On RM568,000 at a 90 percent margin of finance over 35 years at 3.7 percent per annum, roughly RM2,172 a month. Indicative for budgeting and not an offer of finance. See our home loan eligibility guide.
Is this the full price?
The figure shown is the gross developer list price for Block B. The Sale and Purchase Agreement governs what you finally pay. Ask us on WhatsApp about the specific unit you are considering.
WhatsApp Us