Trinity Rainfora, Bandar Kinrara
Freehold, and 400 metres of covered walkway to the LRT.
535 homes in two 31-storey towers. Topped out May 2026. Block A sold out, Block B now open.
Free · No obligation · Replies in 5 min
Overview
A rainforest brief, on a transit site
Trinity Rainfora sits on 2.4 acres of freehold land in Bandar Kinrara, Puchong, and is built around one practical idea: a 400 metre covered walkway to the Kinrara BK5 LRT station. Covered is the part that matters. A walk you will actually take in a downpour is worth more than a shorter one you will not.
Two 31-storey towers hold 535 homes from 739 to 1,184 sq ft. The developer marked the topping out in May 2026, which means the structure is up and the remaining risk is fit-out rather than construction. Block A, launched September 2024, is fully taken up. Block B is the phase now on sale.
Floor plans
Six layouts, 739 to 1,184 sq ft
Every layout has a balcony and a kitchen cabinet included. Type E is the dual key, which gives you a separate studio with its own entrance behind the same front door. Drawings below are the developer's own.
Type B / B1
- Overall width
- 6,700 mm
- Kitchen cabinet
- Included
- Air conditioning
- Pre-installed, Panasonic
Type C
- Kitchen cabinet
- Included
- Air conditioning
- Pre-installed, Panasonic
- Ceiling height
- Approximately 2.8 m
Type D
- Kitchen cabinet
- Included
- Wall hacking
- Not permitted on this type
- Ceiling height
- Approximately 2.8 m
Type E, dual key
- Overall
- 12,875 by 10,450 mm
- Layout
- Separate studio with its own entry
- Wall hacking
- Permitted, with approval
Type F
- Kitchen cabinet
- Included
- Wall hacking
- Permitted, with approval
- Access cards
- 4 resident, 2 master
Type G
- Overall width
- 12,460 mm
- Wall hacking
- Permitted, with approval
- Access cards
- 4 resident, 2 master
The developer has not published a per-unit price list, so the figures on this page are the published entry price for Block B rather than a price for each type. Ask us for the current unit list. Instalments assume a 90 percent margin of finance over 35 years at 3.7 percent per annum, and are indicative for budgeting rather than an offer of finance.
Facilities
36 facilities, and a waterfall you can sit under
The podium deck carries the set the project is named for. The ones below are the facilities the developer has named publicly; the full 36 are listed on the podium plan in the brochure.
Water and wellness
- 25 m infinity pool
- Rainforest Canopy
- Waterfall Jacuzzi
- Aqua gym
- Yoga deck
- Gymnasium
Green and social
- 150 m jogging trail, 1.5 to 2.7 m wide
- Glamping Forest
- Study Garden
- Nature Playscape
- Edible garden
- Co-working spaces
- Multipurpose hall, 864 sq ft, seats about 50
Location
Bandar Kinrara 5, Puchong
The site connects to Kinrara BK5 LRT station on the Sri Petaling line by a 400 metre covered walkway, with direct access to the Bukit Jalil Highway, the LDP and Kesas. Distances below are from the developer's own connectivity chart.
- KPJ Ambulatory Care Centre Kinrara
- 400 m
- Giant Hypermarket
- 1 km
- SJK (C) Yak Chee
- 3 km
- Tzu Chi International School
- 4 km
- SK Puchong Jaya
- 5 km
- Pavilion Bukit Jalil
- 6 km
- SetiaWalk Mall
- 6 km
- Sunway Medical Centre
- 6 km
- Monash University Malaysia
- 7 km
- IOI Mall Puchong
- 7 km
- Sunway Pyramid
- 8 km
Gold Assurance
The warranty is longer than the standard
Trinity backs the project with a 10-Year Gold Assurance Program. The industry standard defect liability period is 24 months, so the comparison below is the reason to care.
Standard is 24
Against roof leaks
Against tile pop-ups
Developer
Trinity Group Sdn Bhd
Trinity Group has delivered developments with a cumulative gross development value above RM2.8 billion. Trinity Rainfora itself carries a GDV of RM395 million. The legal developer entity for this project is Darul Dinasti Sdn Bhd, with Jasmurni Construction as main contractor and Visage Architect as architect.
The record that matters when you are buying something that is not finished is whether the developer hands over when they said they would. Trinity publishes the following delivery history for ten completed developments. Every one of them was delivered on schedule or ahead of it, and the most recent handover was September 2025.
| Project | Units | Launched | Completed | Against schedule |
|---|---|---|---|---|
| Heron Residency, Bandar Bukit Puchong | 290 | Sep 2005 | Jan 2008 | 8 months ahead |
| 19 Residency, Bandar Bukit Puchong | 24 | Mar 2008 | May 2010 | 10 months ahead |
| The Zest, Kinrara 9 | 764 | Apr 2009 | Jan 2012 | 3 months ahead |
| The Z Residence, Bukit Jalil | 1,136 | Jun 2011 | Jun 2014 | On schedule |
| Latitude, USJ 19 | 15 | Nov 2010 | Jan 2013 | 11 months ahead |
| Zeva, Equine South | 778 | Jun 2012 | Jun 2015 | On schedule |
| Trinity Aquata, Sungai Besi | 492 | 2015 | Nov 2018 | On schedule |
| Trinity Lemanja, Kepong | 583 | 2017 | Oct 2021 | On schedule |
| Trinity Pentamont, Mont Kiara | 330 | 2018 | Mar 2023 | On schedule |
| Trinity Wellnessa, Ampang North | 463 | 2022 | Sep 2025 | 4 months ahead |
The Zest sits at Kinrara 9, a few minutes from this site, so it is the one you can go and look at. A delivery record is history and not a guarantee for this project, but it is the closest thing to evidence available before a building is handed over.
The building
Particulars
| Towers | 2, of 31 storeys each |
|---|---|
| Homes | 535 |
| Land area | 2.4 acres |
| Tenure | Freehold |
| Title | Commercial title, serviced apartment |
| Built-up range | 739 to 1,184 sq ft |
| Ceiling height | Approximately 2.8 m |
| Common corridor | Approximately 6 ft wide |
| Visitor parking | 54 bays across levels 1, 3 and 4 |
| EV charging | 5 bays on level 4 |
| Air conditioning | Panasonic, installed before handover |
| Backup power | Generator, about 8 hours |
| Structure | Topped out May 2026 |
| Completion | August 2028, per the advertising permit |
Worth knowing
Why buyers sign, and why some walk away
Why buyers sign
- Freehold land, which is not common on a transit-connected site at this price.
- A 400 m covered walkway to the LRT, not an uncovered one.
- The structure has topped out, so the remaining build risk is fit-out.
- 36-month defect liability against an industry standard of 24, plus 10-year roof and 5-year tile warranties.
- Air conditioning and kitchen cabinet already included, which is real money at handover.
- Block A sold out ahead of schedule, which is a genuine demand signal for the address.
Why some walk away
- Commercial title. It is freehold, but the title is commercial and the product is a serviced apartment, so assessment, utility tariffs and loan terms can differ from a residential-title condominium. Check with your bank before you commit.
- Completion is 2028 on the permit, so progress billings run for years yet.
- The developer has not published a per-unit price list, so the entry figure is a starting point rather than the price of the unit you want.
- Block A is gone, so choice is now limited to what remains in Block B.
- Bandar Kinrara is built out, so the surrounding roads carry real traffic at peak.
Next step
Ask for the live Block B list
Floor plans, the current price list and what is still available in Block B, sent straight to your WhatsApp.
Free · No obligation · Direct WhatsApp reply
Questions